N.J.-S.P. Board Updated on Lighting Projects, Band Room Relocation

BluejayThe North Judson-San Pierre School Corporation is taking on some lighting projects during the holiday break. Superintendent Dr. Annette Zupin told the school board Tuesday improvements at the bus garage are already underway. During the break lighting upgrades will be made in the middle and high school gym. Zupin says care has been taken to ensure that project does not interfere with any scheduled games or practices.

Zupin was also asked about when the band may get their room back now that repairs have been made to the upstairs space that was formerly the weight room. Structural concerns forced the closure of that space two years ago, and the weight room was moved into the band room in the music suite.

Zupin says the weight room cannot be moved back upstairs due to weight restrictions for the mezzanine. It is now being used as a practice area for other athletic programs.

The band director conducts classes on the auditorium stage, but that becomes an issue when functions are scheduled. Also, due to the size of the beginning band, the class is split into two groups, with some of the students taken to the cafeteria to practice.

Zupin promised to find a permanent space for the band by the start of the 2017-18 school year. She says that’s preferable to moving them multiple times. Zupin adds the former band room is an ideal location for the weight room due to its proximity to the gym and locker rooms.