Road Work Planned For U.S. 35

U.S. 35 between U.S. 6 and U.S. 30 will closed tomorrow and Wednesday for a chip-seal and fog seal operation to repair the road surface. Detours will be clearly marked.

The Indiana Department of Transportation will be pouring a liquid asphalt emulsion on the roadway and covering the liquid asphalt with crushed stone to provide a new surface. Chip-sealing helps extends the life of the highway.

The fog seal is applied on top of the chip-seal work and it is a light application of black asphalt material that locks in stone and help with dust problems.

Loose stone will be present directly after the work is complete so drive slowly and allow extra space between your vehicle and the car in front of you.